Hi Again. Well the lining of the shower with ply was completed this weekend. The whole job has been on hold for months waiting to get the mains electrical install done. With that job done, I got to work putting plywood onto the remaining walls to support the plastic sheeting which will waterproof the shower/toilet. The following pic will give an idea of how it looks at this stage. All of the plywood is in, just got the cut the plastic to size and glue to the ply.
The other job that I got done this weekend was to finally get all of the curtains up and working properly. I was intending to have a venetian blind made for the windows behind the kitchen bench, but was talked out of it because they rattle when you're driving apparently. I had curtains made, so I decided to make use of them.
Sorry about the mess. As you can see, work is still in progress I have been doing all of those little jobs that need to be done so I can say the job is finally finished. A post on the mains and 12 volt systems now that they are all done is next.